See inside Contractor Bid Hub

A quick look at every screen before you sign up. No login required.

01 · Dashboard

Dashboard

See active bids, win rate, and pipeline value the moment you sign in.

contractorbidhub.app — Dashboard
Active bids
12
Win rate
38%
Avg. cycle
6 d
Pipeline value (last 90 days)
02 · Bids

Bids

Track every project from drafting to won or lost. Filter, sort, and export.

contractorbidhub.app — Bids
ProjectClientStatusAmount
Hwy 14 DrainageKnife RiverSubmitted$248,400
Elm Creek SubdivisionHolstein BrosDrafting$92,100
Lot 7 Site PrepBauer DevWon$58,750
Co Rd 22 CulvertsCarver CountyLost$31,900
03 · Estimate Calculator

Estimate Calculator

Get accurate material quantities in seconds.

contractorbidhub.app — Estimate Calculator
Concrete (cubic yards)
Length120 ft
Width24 ft
Depth6 in
Total53.3 cy
Trucking
Haul distance18 mi
Load size16 cy
Truck rate$135/hr
Loads / cost14 · $3,780
04 · Proposals

Proposals

Generate clean, branded proposals and export to PDF for the client.

contractorbidhub.app — Proposals
Hwy 14 Drainage — Proposal v2
Prepared for Knife River · 05/12/2026
Mobilization$8,400
Excavation (1,240 cy)$74,400
15" RCP storm pipe (820 lf)$98,400
Catch basins (6 ea)$22,200
Riprap & restoration$15,600
Total$219,000
Status
Sent to client
PDF exported
Emailed 05/12
Awaiting signature
05 · Unit Pricing

Unit Pricing

Your company's pricing library — reused across every bid automatically.

contractorbidhub.app — Unit Pricing
ItemUnitYour price
Excavation, commonCY$8.50
Excavation, rockCY$32.00
15" RCP storm pipeLF$120.00
Catch basin, 4' diaEA$3,700.00
Class 5 aggregateTON$18.75
HydroseedingSY$0.95

Ready to bid faster?

$149/month or $1,500/year. 30-day money-back guarantee.