See inside Contractor Bid Hub
A quick look at every screen before you sign up. No login required.
01 · Dashboard
Dashboard
See active bids, win rate, and pipeline value the moment you sign in.
contractorbidhub.app — Dashboard
Active bids
12
Win rate
38%
Avg. cycle
6 d
Pipeline value (last 90 days)
02 · Bids
Bids
Track every project from drafting to won or lost. Filter, sort, and export.
contractorbidhub.app — Bids
| Project | Client | Status | Amount |
|---|---|---|---|
| Hwy 14 Drainage | Knife River | Submitted | $248,400 |
| Elm Creek Subdivision | Holstein Bros | Drafting | $92,100 |
| Lot 7 Site Prep | Bauer Dev | Won | $58,750 |
| Co Rd 22 Culverts | Carver County | Lost | $31,900 |
03 · Estimate Calculator
Estimate Calculator
Get accurate material quantities in seconds.
contractorbidhub.app — Estimate Calculator
Concrete (cubic yards)
Length120 ft
Width24 ft
Depth6 in
Total53.3 cy
Trucking
Haul distance18 mi
Load size16 cy
Truck rate$135/hr
Loads / cost14 · $3,780
04 · Proposals
Proposals
Generate clean, branded proposals and export to PDF for the client.
contractorbidhub.app — Proposals
Hwy 14 Drainage — Proposal v2
Prepared for Knife River · 05/12/2026
Mobilization$8,400
Excavation (1,240 cy)$74,400
15" RCP storm pipe (820 lf)$98,400
Catch basins (6 ea)$22,200
Riprap & restoration$15,600
Total$219,000
Status
Sent to client
PDF exported
Emailed 05/12
Awaiting signature
05 · Unit Pricing
Unit Pricing
Your company's pricing library — reused across every bid automatically.
contractorbidhub.app — Unit Pricing
| Item | Unit | Your price |
|---|---|---|
| Excavation, common | CY | $8.50 |
| Excavation, rock | CY | $32.00 |
| 15" RCP storm pipe | LF | $120.00 |
| Catch basin, 4' dia | EA | $3,700.00 |
| Class 5 aggregate | TON | $18.75 |
| Hydroseeding | SY | $0.95 |